# Talgo and Renfe settle differences with 15 variable-gauge Avril trains

Canonical-URL: https://notitur.com/en/digest/talgo-renfe-avril-variable-gauge
Text-Version: https://notitur.com/en/digest/talgo-renfe-avril-variable-gauge.txt
Markdown-Version: https://notitur.com/en/digest/talgo-renfe-avril-variable-gauge.md
Language: en
Published: 2026-07-02T10:45:53.627Z
Modified: 2026-07-02T10:45:53.627Z
Author: Joan Sanz
Topics: Railways & Transport
Summary: The agreement modifies 15 S106 trains to run on variable-gauge tracks, unblocking the project and boosting intercity connectivity.

## Article

Talgo and Renfe have reached an agreement that puts an end to years of tensions over the **S106** project. The solution: **15 Avril trains** will be configured with **variable gauge**, a modification that allows them to run on both high-speed and conventional tracks. [According to Hosteltur](https://www.hosteltur.com/177300_talgo-acuerda-con-renfe-configurar-15-trenes-avril-s106-con-ancho-variable.html?utm_source=rss&utm_medium=rss&utm_campaign=talgo-acuerda-con-renfe-configurar-15-trenes-avril-s106-con-ancho-variable), the deal was sealed in Rivabellosa and unlocks one of the most contentious projects in the rail sector.

**What does this mean for travelers?** More flexibility. A train that can connect cities without transfers, using the same infrastructure. Operationally, Renfe gains a more efficient corridor and Talgo proves that its variable-gauge technology is a real asset, not a promise. **The travel market benefits**: more connections, less downtime, and an offer that competes head-on with air travel over medium distances.

**My take:** This agreement was overdue. We've been hearing "S106 problems" for years like a mantra, and in the end the solution was technical, not political. **Kudos to Talgo** for standing by its product. **Kudos to Renfe** for needing versatile rolling stock to optimize routes. **Hopefully they hit the tracks soon.**

## Sources

- Hosteltur: https://www.hosteltur.com/177300_talgo-acuerda-con-renfe-configurar-15-trenes-avril-s106-con-ancho-variable.html?utm_source=rss&utm_medium=rss&utm_campaign=talgo-acuerda-con-renfe-configurar-15-trenes-avril-s106-con-ancho-variable

## Citation

Talgo and Renfe settle differences with 15 variable-gauge Avril trains. Notitur. 2026-07-02. https://notitur.com/en/digest/talgo-renfe-avril-variable-gauge
